1976
Incorporation of the Company, TERRAZZO LTD. in Sharjah
1977
Commercial production of Mosaic Tiles in plant no.1
1980
Acquired plant no.2 in Sharjah with the pressing and polishing machines already in place
1981
New plant no.3 in Sharjah was comissioned with Pre-cast division
1983
Marble & Granite division was started in plant no. 3 in Sharjah
1984
GRP division was started in plant no. 3 in Sharjah
1990
Expansion in plant no.1 by adding Longinotti press machine
1992
Expansion in plant no.2 by adding K 40 press and Modulflow polishing machines
1993
Expansion in plant no.1 by adding OCEM 650 press machine
1994
Expansion in plant no.1 by adding another Modulflow polishing machine
1996
Filteration unit added in plant no. 1
Incorporation of a new Company in Dubai, TERRAZZO DUBAI CO. LLC
New plant no. 4 at Al Quoz, Dubai was comissioned and GRP division shifted here
1997
ISO certification received for Mosaic products in plant no.1 and 2
Prefab division was started in plant no.4 in Dubai, United Arab Emirates
1998
GRC division was started in plant no.4 in Dubai, United Arab Emirates
1999
Expansion in plant no.2 in Sharjah, by adding another K 40 press machine
2002
New plant no.5 at DIP, Dubai was comissioned and Prefab division shifted here
Expansion in plant no.1 in Sharjah, by adding a Shotblasting machine
ISO certification received for GRP and GRC products in plant no.4
2003
Roto-Molding division was started in plant no.4 in Dubai
2004
Existing filteration unit in plant no. 1 shifted to plant no.2 in Sharjah
Bigger and Better Filteration unit added in plant no.1 in Sharjah
2005
Expansion in plant no.3 in Sharjah by adding Flow Waterjet cutting machine
Acquired 1,000,000 sq. feet of land in Dubai industrial City for future expansion
2007
New plant no.6 at DIP, Dubai commissioned for manufacturing Kerbstones and large Paving slabs
Cocrete pre-cast division shifted to plant no.6 in Dubai
2009
New plant no.7 at Dubai Industrial City, Dubai commissioned for manufacturing Blocks and Interlock Pavers
2012
Automation at plant 1 by installing in-house batching plant
2014
New GRC Plant 8 under completion, area of 450,000 sq. feet at Dubai Industrial City.
Labour colonly under completion